Coastal Pile Cutters International, LLC., is brought in on a large overpass replacement that will shut down a primary thoroughfare in the heart of the city.

Coastal's equipment and crew wait for the prime contractor to shut down the traffic so they can start the round the clock removal of the overpass. Working two 12 hour shifts , Coastal was able to remove 12 caps and 36 (42) inch piling and have the traffic flowing by noon the following day. When your bridge, pier or dock demolition work has a limited time frame, call the people who specialize in the business of quick and cost effective pile cutting. Call us with your questions and let us show you how we can save you time and money.

Round the clock operations were required to quickly remove the structure and get the traffic flowing again. 

Starting at dusk, the caps and piling were cut and removed.

Well into the night, Coastal's crew worked to remove the structure.